Mars Atmosphere & Volatile EvolutioN (MAVEN)
Mission Overview
MAVEN launched successfully on 18 November 2013 at 18:28 UT (1:28 p.m. EST) from Cape Canaveral Air Force Station.
The Mars Atmosphere and Volatile EvolutioN (MAVEN) mission is designed to explore Mars' upper atmosphere and ionosphere, and interactions with the solar wind, specifically to determine the loss of volatile compounds to space through time and how it has affected the history of Mars' atmosphere and climate. MAVEN has four primary scientific objectives: (1) Determine the role that loss of volatiles from the Mars atmosphere to space has played through time; (2) determine the current state of the upper atmosphere, ionosphere, and interactions with the solar wind; (3) determine the current rates of escape of neutral gases and ions to space and the processes controlling them; and, (4) determine the ratios of stable isotopes that will tell Mars' history of loss through time. MAVEN is part of NASA's Mars Scout program.
Spacecraft and Subsystems
The MAVEN spacecraft consists of a cubic primary central structure with two solar panel "wings". The central structure is 2.3 x 2.3 m and 2 m high, constructed of panels of aluminum honeycomb sandwiched between graphite composite face sheets. A 1.3-m diameter cylindrical propellant tank is at the center of the structure and acts as the primary vertical load-bearing structure. The tank can hold 1640 kg of hydrazine. A payload of eight instruments is mounted on the spacecraft: Magnetometer, Neutral Gas and Ion Mass Spectrometer, Langmuir Probe and Waves, Imaging Ultraviolet Spectrometer, Solar Wind Electron Analyzer, Solar Wind Ion Analyzer, Solar Energetic Particles, and a SupraThermal And Thermal Ion Composition.
MAVEN launched on an Atlas V 401 with a single-engine Centaur upper stage on 18 November 2013 at 18:28 UT. It reached Mars and entered orbit, completing its orbit insertion burn at 2:24 UT on 22 September 2014 (10:24 p.m. EDT, Sept. 21). It will go into a 4.5 hour science orbit with an inclination of 75 degrees and a periapsis of 150 km. The nominal science mission will last 1 year and will include 5 "deep-dip" maneuvers during which the periapsis will be lowered to 125 km for 5-day periods.
For the latest news on the MAVEN mission see: http://www.nasa.gov/mission_pages/maven/main/
Note: Mission information is from NASA's Space Science Data Coordinated Archive.
Spending Summary
| FY 2024 Total | By of FY 2024 | By of FY 2025 | Change from FY 2024 | |
|---|---|---|---|---|
| Obligations | $18.2M | $18.2M | $22.2M | +$4.0M |
| Outlays | $19.0M | $19.0M | $19.0M | +$1.0M |
Comparing Contract Obligations
Running sum of 5 awards. Shows cumulative actual spending by fiscal period. Period 2 represents combined Oct-Nov data (this is a reporting quirk of USASpending.gov). Negative values indicate adjustments or credits. Data last updated: 2026-01-13
Download OptionsWhat are obligations? Obligations represent NASA's legal commitments to spend money — contracts signed, grants awarded, and purchase orders issued. Unlike outlays (actual payments), obligations show when spending decisions are made.
Reading this chart: The chart displays cumulative obligations throughout the fiscal year (October through September). The solid line shows the current fiscal year's running total, while the dotted line (when available) shows the previous year for comparison. This allows you to see spending patterns and track whether funding is ahead or behind the prior year's pace.
Comparing Contract Outlays
Running sum of 5 awards. Shows cumulative actual spending by fiscal period. Period 2 represents combined Oct-Nov data (this is a reporting quirk of USASpending.gov). Negative values indicate adjustments or credits. Data last updated: 2026-01-13
Download OptionsWhat are outlays? Outlays represent actual cash payments made by NASA. While obligations show when spending decisions are made, outlays show when money actually leaves the treasury.
Reading this chart: The chart displays cumulative outlays throughout the fiscal year (October through September). The solid line shows the current fiscal year's actual spending, while the dotted line (when available) shows the previous year for comparison. This reveals the actual cash flow timing and whether spending is keeping pace with the prior year.


